
Previous Posts
- Maintenance - Engine 80hr Service
- Maintenance - Engine 50hr Service
- Maintenance - Engine 50h Service
- Christmas Message 2007
- A Journey into the Unknown - Part VI
- A Journey into the Unknown - Part V
- A Journey into the Unknown - Part IV
- A Journey into the Unknown - Part III
- A Journey into the Unknown - Part II
- A Journey into the Unknown - Part I
Archives
Wednesday, February 03, 2010
Maintenance - Engine 50hr Service
Fuel System
Primary cartridge - Baldwin FFRC 11861
Secondary cartridge - FFRC 11863
Drain and clean housings, replace worn banjo fitting, bleed system.
Oil
Engine. Drain and replace Gearbox - drain and replace.
Cooling system
Drain and replace (add anti-corrosion fluid) to normal level, check for leaks - all OK.
Batteries
Crankset - Electrolyte levels OK (SG1740) fully charged.
Domestic Banks - Annual electrolyte top up (17 litres) (SG1730)
Stern Gland - Refill reservoir (2litres)
Visual checks - Alternator & dynamo belt tension - OK. (small adjustment of alternator belts).
Run up engine in forward gear 1 hour. Oil pressure, water temperature, batteries - all within limits.
Observations: As log will show we have not taken VRIJHEID out to play in 2009 but with spring only a few months away and fewer commitments we intend changing that in 2010.